CERN Accélérateur de science

All PS Complex

Derniers ajouts:
2020-07-20
16:22
TT20 Transport and Splitting of Beams Extracted Using Crystal Shadowing in LSS2 of the SPS / Arrutia Sota, Pablo Andreas (University of London (GB)) ; Dutheil, Yann (CERN) ; Fraser, Matthew Alexander (CERN) ; Velotti, Francesco Maria (CERN)
The CERN Super Proton Synchrotron (SPS) is employed to supply slow extracted beams to fixed target experiments located in CERN’s North Area [...]
CERN-ACC-NOTE-2020-0040.
- 2020. - 17 p.
Access to fulltext

Notice détaillée - Notices similaires
2020-07-14
04:05
Identification and characterization of high order incoherent space charge driven structure resonances in the CERN Proton Synchrotron / Asvesta, F. (CERN ; Natl. Tech. U., Athens) ; Bartosik, H. (CERN) ; Gilardoni, S. (CERN) ; Huschauer, A. (CERN) ; Machida, S. (Rutherford) ; Papaphilippou, Y. (CERN) ; Wasef, R. (CERN)
Space charge is typically one of the performance limitations for the operation of high intensity and high brightness beams in circular accelerators. [...]
arXiv:2005.06575.
- 19 p.
Fulltext

Notice détaillée - Notices similaires
2020-07-10
10:20
What sort of coupling impedances are tolerable in the future CPS ? / Sørenssen, A
CERN-MPS-DL-70-1 ; MPS-DL-70-1.
- 1970. - 14 p.
Full text

Notice détaillée - Notices similaires
2020-07-07
14:33
Evaluation of the stability criterion for a coasting beam in the PS / Umstatter, H H (CERN)
CERN-MPS-SR-Note-73-29.
- 1973. - Mult. p.
Full text

Notice détaillée - Notices similaires
2020-06-23
17:34
Modelling, Control and Stability Analysis of an RF Cavity in CERN LINAC4 / Andersen, Martin
This thesis set out to explore ways to optimize cavity control loops for CERN LINAC4 linear particle accelerator [...]
CERN-THESIS-2020-050 - 104 p.

Full text
Notice détaillée - Notices similaires
2020-06-18
17:04
The CERN 25 GeV Proton Synchrotron The backbone of CERN celebrated its 60th Anniversary / Hanke, Klaus (CERN) ; Hubner, Kurt
On 24 November 1959 the first proton beam was accelerated to 24 GeV. [...]
CERN-ACC-2020-013.
- 2020.
Fulltext from the publisher - Full text

Notice détaillée - Notices similaires
2020-06-08
15:08
Development of a Hybrid Pixel Detector Based Transverse Profile Monitor for the CERN Proton Synchrotron / Levasseur, Swann
Abstract The ability to rapidly identify the source of emittance blow-up in the CERN Proton Synchrotron (PS) is crucial to ensure the good operation of the Large Hadron Collider (LHC) and its successor the High Luminosity LHC (HL-LHC) [...]
CERN-THESIS-2019-354 - 177 p.

Full text
Notice détaillée - Notices similaires
2020-05-11
13:20
Impedance Compliance Testing for the PS Internal Beam Dump / Jhugroo, Dhiren (University of Bath (GB)) ; Popovic, Branko Kosta ; Vollinger, Christine (CERN)
The performance of the accelerators at CERN critically depends on the overall beam coupling impedance of the individual elements. [...]
CERN-ACC-NOTE-2020-0028.
- 2020. - 7 p.
Full text

Notice détaillée - Notices similaires
2020-04-28
08:58
Development and Beam Irradiation of Ir/W/Ta/Ta-Alloys Refractory Metals and Cladding Via Hot Isostatic Pressing at CERN for Beam Intercepting Devices Applications / Busom Descarrega, Josep (CERN) ; Torregrosa, Claudio (CERN) ; Calviani, Marco (CERN)
The current contribution details the research and development activities associated to refractory metals such as iridium, tungsten, tantalum and tantalum-tungsten alloys executed at CERN in the framework of the development of beam intercepting devices, including beam irradiation tests both at the HiRadMat Facility as well as in the North Area Target Complex..
2020 - 9 p. - Published in : JPS Conf. Proc. 28 (2020) 041002 Fulltext: PDF;
In : 14th International Workshop on Spallation Materials Technology, Fukushima, Japan, 11 - 17 Nov 2018, pp.041002

Notice détaillée - Notices similaires
2020-04-27
10:58
Performance validation of the upgraded PSB Transfer Kicker BT2.KFA20 / Coralejo Feliciano, Luis Miguel (CERN) ; Sermeus, Luc (CERN)
In the framework of the LHC Injector Upgrade (LIU) project [1], the CERN PSB Transfer Kicker KFA20 pulse power generator has been modified, as done for the Transfer Kicker KFA10 pulse power generator, in order to be compatible with the extraction kinetic energy increase of the PSB from 1.4 to 2.0 GeV. [...]
CERN-ACC-NOTE-2020-0027.
- 2020. - 3 p.
Full text

Notice détaillée - Notices similaires