CERN Accelerating science

All PS Complex

Posledne pridané:
2022-01-20
09:39
CERN-MEDICIS: A Unique Facility for the Production of Non-Conventional Radionuclides for the Medical Research / Duchemin, Charlotte (CERN) ; Barbero-Soto, Esther (CERN) ; Bernardes, Ana (CERN) ; Catherall, Richard (CERN) ; Chevallay, Eric (CERN) ; Cocolios, Thomas (Leuven U.) ; Dorsival, Alexandre (CERN) ; Fedosseev, Valentin (CERN) ; Fernier, Pascal (CERN) ; Gilardoni, Simone (CERN) et al.
The MEDICIS facility is a unique facility located at CERN dedicated to the production of non-conventional radionuclides for research and development in imaging, diagnostics and radiation therapy. It exploits in a Class A work sector, a dedicated isotope separator beam line, a target irradiation station at the 1.4 GeV Proton Synchroton Booster (PSB) and receives activated targets from external institutes during CERN Long Shut-Downs. [...]
2021 - 5 p. - Published in : JACoW IPAC 2020 (2020) THVIR13 Fulltext: PDF;
In : 11th International Particle Accelerator Conference, Caen, France, 10 - 15 May 2020, pp.THVIR13

Úplný záznam - Podobné záznamy
2022-01-19
14:57
Energy Matching Between the AD and ELENA / Albright, Simon (CERN) ; Gamba, Davide (CERN)
Correct energy matching between two synchrotrons is necessary to optimise performance of the downstream accelerator. [...]
CERN-ACC-NOTE-2022-0004.
- 2022. - 3 p.
Full text

Úplný záznam - Podobné záznamy
2022-01-18
14:33
Recommissioning of the CERN AD Stochastic Cooling System in 2021 after Long Shutdown 2 / Hofle, Wolfgang (CERN) ; Oliveira, Joao Carlos (CERN) ; Carli, Christian (CERN) ; Caspers, Fritz (European Scientific Institute (FR)) ; Dupuy, Bruno (CERN) ; Gamba, Davide (CERN) ; Louwerse, Reinier (CERN) ; Ponce, Laurette (CERN) ; Myklebust, Vebjorn Roed ; Rey, Stephane Franck (CERN) et al.
The power system of the Stochastic Cooling System of the anti-proton decelerator AD at CERN, installed on top of the shielding blocks of the AD ring, was completely dismantled during the long shutdown 2 (LS2) at the end of the 2018 run in order to gain access to the accelerator for magnet consolidation. [...]
CERN-ACC-NOTE-2022-0003 ; ISBN: 978-3-95450-243-1 ; ISSN: 2226-0374 ; doi: 10.18429/JACoW-COOL2021-S302.
- 2022. - 6 p.
Access to fulltext

Úplný záznam - Podobné záznamy
2022-01-05
12:30
Energy Matching Between Linac4 and the PSB / Albright, Simon (CERN) ; Antoniou, Fanouria (CERN) ; Asvesta, Foteini (CERN) ; Skowronski, Piotr Krzysztof (CERN)
Until 2018, before Long Shutdown 2, injection to the PSB was done with a coasting proton beam from Linac2, which was then captured by the RF system. [...]
CERN-ACC-NOTE-2022-0001.
- 2022. - 7 p.
Full text

Úplný záznam - Podobné záznamy
2021-12-15
00:44
Challenging the Standard Model by high precision comparisons of the fundamental properties of antiprotons and protons / Borchert, Matthias Joachim
This thesis describes high precision measurements on the fundamental properties of the antiproton, namely the charge-to-mass ratio and the magnetic moment [...]
CERN-THESIS-2021-230 - Hannover : Gottfried Wilhelm Leibniz Universität, 2021-12-14.


Úplný záznam - Podobné záznamy
2021-12-14
06:22
Chapter 5 Infrastructure consolidation / Burdelski, P (CERN) ; Dragoni, F (CERN) ; Grau, Silvia (CERN) ; Guillaume, J-C (CERN) ; Jaillet, D (CERN) ; Mcilwraith, S (CERN) ; Polenghi, M (CERN) ; Sanchez, E (CERN)
Constructed in 1963, Building 157 is 113 m long and 43 m wide at ground level. The roof is 21.8 m high at the central point above a skylight running longitudinally down its centre; it has a slope of 20% running down to the longitudinal façade summits at 15.6 m [...]
2021 - 27 p. Fulltext: PDF;
In : CERN Proton Synchrotron East Area Facility, pp.89-115

Úplný záznam - Podobné záznamy
2021-12-14
06:22
Chapter 4: Beamline – main components / Carlsen, B (CERN) ; Carvalho, F (CERN) ; De Jesus, V (CERN) ; De La Gama, J (CERN) ; Ebn Rahmoun, A (CERN) ; Froeschl, Robert (CERN) ; Gourber-Pace, Marine (CERN) ; Grenier-Boley, Edouard (CERN) ; Lopez, R (CERN) ; Mompo, Richard (CERN) et al.
The East Area renovation will cover the refurbishment of the East Hall with its beamlines and infrastructures. A re-design of the beamlines is included to improve the magnet situation, the radiation situation, and maintainability in general. [...]
2021 - 45 p. Fulltext: PDF;
In : CERN Proton Synchrotron East Area Facility, pp.43-87

Úplný záznam - Podobné záznamy
2021-12-14
06:22
Chapter 3: Design of the East Area facility after renovation / Bernhard, Johannes Benedikt (CERN) ; Dogru, G (CERN) ; Evrard, S (CERN) ; Froeschl, Robert (CERN) ; Harrouch, E (CERN) ; Lazzaroni, M (CERN)
The PS primary proton beam is slowly extracted at 24 GeV/c towards the East Area with the help of the third- order resonance technique over a typical spill length of 350 to 450 ns within 2.4 s cycles. The number of East Area extractions is usually around five to six per overall PS super-cycle of typically 40 s and depends on both users and schedule constraints, respectively. [...]
2021 - 26 p. Fulltext: PDF;
In : CERN Proton Synchrotron East Area Facility, pp.17-42

Úplný záznam - Podobné záznamy
2021-12-14
06:22
Chapter 1: Introduction, scope, and schedule / Bernhard, Johannes Benedikt (CERN) ; Evrard, Sebastien (CERN) ; Harrouch, E (CERN)
The East Area of the CERN Proton Synchrotron has served the physics community for over 50 years and remains extremely popular and necessary, among other things, to complete full calibration over a large energy spectrum of the detectors to be installed in the Large Hadron Collider (LHC) experiments according to the needs of the upgrade for the High Luminosity LHC. In addition, physics programs like CLOUD, and test facilities such as IRRAD and CHARM are based on a reliable and easily maintainable East Area. [...]
2021 - 6 p. Fulltext: PDF;
In : CERN Proton Synchrotron East Area Facility, pp.1-6

Úplný záznam - Podobné záznamy
2021-12-14
06:22
Chapter 2: East Area renovationMotivations and general description / Bernhard, Johannes Benedikt (CERN) ; Evrard, Sebastien (CERN) ; Gatignon, Lau (CERN) ; Harrouch, E (CERN) ; Wilkens, Henric (CERN)
This chapter gives a general description of the East Area before and after Long Shutdown 2 (LS2)..
2021 - 10 p. Fulltext: PDF;
In : CERN Proton Synchrotron East Area Facility, pp.7-16

Úplný záznam - Podobné záznamy